top of page

A period of 4 months is set by the Building Control Authority in a Regularisation cert.


There is no mechanism to extend. It is an offense to commence work on a building without a Fire Safety Certificate (where required) and the Regularisation Cert is a chance to be in compliance with the fire safety certification regime. If the works are not carried out within the 4- month period, the certificate will not have effect.

Comments


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page