top of page

How to start with your Kitchen Renovation


A kitchen extension is a popular project for homeowners who want to create more space, improve the layout, or take advantage of garden views. You can achieve the space you want by expanding the back of your house, moving into a side return, or combining both options. It's important to consider how you will use and enjoy your extension, as well as how to make garden access easy and bring in natural light.


Planning permission may be required for larger extensions or additions to a flat, and listed building consent is always required for alterations to a listed building. The length of time for a kitchen extension project depends on the scope of the work and how well it is managed, but it can take anywhere from 10 to 12 weeks for a small extension to up to six months for a large one.


To ensure the extension blends in with the rest of the house,

it's important to maintain structural elements such as floor and ceiling heights and match the style of features like skirting boards, doors, and window frames.


A kitchen remodel or renovation may be necessary due to the need to improve the floor plan, add storage and prep space, or repair damage from frequent use. It can be a minor update, such as replacing the countertops, or a major overhaul, including changing the layout and adding new appliances. The cost of a kitchen remodel or renovation will depend on the extent of the work and the materials used

Comments


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page